Do I need a contractor?
If you own a building or structure, and it is not for sale or lease, 489.103(7), Florida Statutes, allows you to act as your own contractor. “Owners of property when acting as their own contractor and providing direct, on-site supervision themselves of all work not performed by licensed contractors, when building or improving farm outbuildings or one-family or two-family residences on such property for the occupancy or use of such owners and not offered for sale or lease, or building or improving commercial buildings, at a cost not to exceed $75,000, on such property for the occupancy or use of such owners and not offered for sale or lease.” Owners, acting as their own contractor are required to personally appear and sign the permit application along with the Owner-Builder Affidavit 489.103(7), Florida Statutes.

Show All Answers

1. When is a permit required?
2. How much will my permit cost?
3. What happens if I choose not to obtain the required permits?
4. Do I need a contractor?
5. If I use a contractor, what guidelines should I use to choose one?
6. How long does it take to get a permit?
7. What happens after the permit is issued?
8. How much time do I have once the permit is issued?
9. What do I do with the permit and associated documents after I pick them up at the Building Division?
10. If I fail an inspection, what do I do?
11. Do I need a permit to do minor roof repair?
12. Do I need a permit to install a fence?
13. I want to remodel the inside of my house. What work can be done without a permit?
14. Do I need a permit to replace a garage door, exterior door or windows?
15. I need to have my doors and windows inspected. Does the inspector need to gain access to the inside to conduct the inspection?
16. I need to have my new Air Conditioning system inspected. Does the inspector need to gain access to the inside to conduct the inspection?
17. How do I obtain a Certificate of Occupancy or Certificate of Completion?
18. Where is the permitting office?
19. What are the Building Division Hours of operation?